Erosion Control
Projects
|
Fort Bragg, NC
Wayne Howard
(910) 396-2784
|
$2,483,000
(Est.)
|
Eight erosion control projects located in various locations throughout Fort Bragg (Drop Zones, impact/observation areas, tank and fire trails and roadside ditches). All projects were located in protected areas for the Red Cockaded Woodpecker. Solutions included cellular confinement systems for roadway stabilization, cast in place and modular retaining walls, concrete grout filled fabric, gabions, rock filled mattress and other non-conventional, but new an innovative, methods of stabilization. Each project required unique solution to a challenging erosion problem. Several projects required wetlands (401) and water quality permitting (404). Responsibilities included design, drainage design, hydrology survey, specifications and permitting.
|
The stormwater management project covered the 55-acre generation plant site into a zero discharge facility exceeding the new NPDES stormwater management requirements. The project included the construction of a 5.5 acre retention pond with the slopes protected by concrete grout filled fabric, a dam, an extensive storm drainage collection system and the area completely bermed. An ''as-built'' topo of the entire plant site was performed as well as boundary survey and survey acquisition of 8 additional parcels, furnished to PWC in the AutoCADD format. Other responsibilities included construction management (multiple simultaneous projects by others were constructed 24 hours a day), construction staking, and project administration.
|