|
Recondo School Erosion Control
The Recondo School at Fort Bragg is used in training ROTC candidates. The project included steel sheet piling, dredging Little River, stream bank stabilization using gabions and rock filled mattress and erosion control measures. Both wetlands permitting and water quality permitting were required and the project is located upstream of the Fort Bragg Water Treatment Plant resulting in stricter permit requirements. The area also has several Red Cockaded Woodpecker colonies making the design and construction more challenging. Responsibilities included survey, sounding the river bottom, design, specifications and permitting.
|